
PV System 7.6 kWp in the Blansko District
IndividualPV system for a family house Installed capacity: 7.6 kWpInstalled nominal battery capacity: 14.2 kWh PV modules placed on the roof of an auxiliary building

IndividualPV system for a family house Installed capacity: 7.6 kWpInstalled nominal battery capacity: 14.2 kWh PV modules placed on the roof of an auxiliary building

IndividualPV system for a family house, including a wallbox Installed capacity: 9.1 kWpInstalled nominal battery capacity: 14.2 kWh PV modules are partially placed on the

PV system for a family house with a capacity of 9.56 kWp and a nominal battery capacity of 14.2 kWh. The aluminum structure is installed

Photovoltaic system installed on a family house with a capacity of 5.45 kWp and a nominal battery capacity of 10.65 kWh.

PV system for a family home Installed Capacity: 5,4 kWpInstalled Nominal Battery Capacity: 14,2 kWh Placement of PV modules on a separate structure on sloping

Photovoltaic system (PV) with a capacity of 6.88 kWp and a 9 kWh battery on a family house. The PV modules are installed on a

The design, supply, and installation of new heat exchangers preheat the raw material (a mixture of kerosene, gas oil, C9 fraction, and circulating gas) for

The steam regeneration process, including NT (Low-Pressure) and VT (High-Pressure) regeneration, helps maximize heat and energy utilization in a steam power plant, thereby increasing overall

Hot water container boilers are designed for quick and temporary production of hot water or steam in various industrial or commercial applications. The greatest advantages

Flue gas recovery is a process used to reclaim heat from exhaust gases produced during fuel combustion, particularly in industrial facilities and energy systems. This
MICo EWC s.r.o.
Hády 968/2
Brno – Maloměřice 614 00
IČ: 07901429
DIČ: CZ07901429